Umwelt
Implementation and compliance with the environmental
management system according to UNI EN ISO 14001 has driven
A. Benevenuta & C. SpA to remarkable results in this field.
Among others:
� Actual control of the major environmental aspects and
constant reduction of their impact.
� Valuable return in terms of
- A) reduced risks, accidents and emergencies
- B) optimisation of assets and resources
- C) increased competitivity in the markets
� Enhancement of our company�s image towards customers,
suppliers, local authorities
Most important results are:
� investments in the environmental field: in 2002, 82.000
EUR. , in 2003, 91.000 EUR
� in Forno Canavese plant, 28.56% of the total
asbestos-based roof covering has been removed (1365 sq.m)
� employees environmental training: year 2002, 245 hours
(93.87% presence), year 2003, 135 hours (91.22% presence)
� remarkable decrease in production of both dangerous (-66.06%,
-43532 kgs) and non-dangerous (-19.43%, -6977 kgs) wastes
� in 2003, Forno Canavese plant was able to drastically
reduce the use of industrial water, by an amount of 9836 cm,
or �69.4%)
� though man-hours in 2003 were notably increased (+21.94%
or +33512 hours), usage of chemical substances and
consumable materials was basically unchanged compared with
2002
� no environmental emergency occurred
� refrigerators of machines bought since 2002 are equipped
with eco-friendly gases
� other activities aimed at reducing the whole environmental
impact: new dust suction-treating equipment for FA-BO shot
blasting machine in Forno; noise reduction treatment of the
centralised oil moisture suction equipment in Rivara plant;
new ammonia pipeline for gas nitriding furnace in Forno; new
noise reduction integral cases for screw press Vaccari and
shearing machine FICEP 560 in Forno; revamping of dust
treating device at OMSG shot blasting machine.
� in-progress activities: resin insulation of forging
presses floor tanks, study for possible replacement of
current electrical condensers with PCB-free new devices.
� short term activities: revamping of evaporative cooling
towers, new plantwide water pipelines for water of
industrial usage (aimed at eliminating possible leakages)
<back
|
|
|